Hong Kong Tung Chung New Town - DCM / LH DCM
Summary
For reclamation work in the Tung Chung area organized by the Hong Kong Civil Engineering Bureau, the marine DCM method was applied to the Shun Long Road Bridge adjacent to the airport and the landfill near the Tung Chung coast, especially, low altitude special ships were built for DCM construction under the pier. For the first time in Hong Kong, 1) The DCM exclusive line A-Frame Luffing System was manufactured and applied in Hong Kong 2) The 4-speed hydraulic expansion rod was applied.
-
Begin 2018.10
Client CEDD (Civil Engineering&Development Department)
-
Location Tung Chung, Hong Kong
Explanation 1. Off-Shore DCM Improvement : 636,064㎥ (D1300mm*4drivers)
2. Off-Shore LHDCM Improvement : 272,788㎥ (D1300mm*4drivers)